US Army Corps of Engineers-2B/3B

Channel Widening and Retaining Wall Cedar Hammock, Wares Creek

This project consisted of two phases that involved dredging of 20,000CY, installation of 12,000 tons of granite stone, dewatering of 4,000LF of canal/navigable waters, the demolition of the existing retaining wall system, and widening of channel including dredging and excavation of 35,000CY of soil and materials.