Our Projects

Town of Surfside

This project actually consisted of two phases, the Surfside Seawall Replacement which included site preparation, demolition, earthwork, drainage facilities, and utility coordination. We also furnished and installed all rip-rap. The second phase consisted of the demolition of the existing tile block system seawall, the construction of king pile and concrete panel, and again installation and furnishing of rip-rap.